Simulate operational changes on a virtual model of the plant and see the impact on downtime, energy, OEE, cost and CO₂ before committing. Adjust the levers — results update live.
Scenario levers
60%
0 days
0%
Monthly savings
€10,419
Annual savings
€125,032
ROI (yr 1)
+595%
Payback
1.7 mo
Scenario vs. baseline (per month)
Unplanned downtime-21%
Baseline
1,240 min
Scenario
980 min
Energy consumption-5%
Baseline
52,000 kWh
Scenario
49,504 kWh
CO₂ emissions-5%
Baseline
14,300 kg
Scenario
13,614 kg
OEE+9%
Baseline
65 %
Scenario
71 %
Phase 1 demo — illustrative model. Phase 3 calibrates per-asset twins from 3–12 months of real history and validates against a locked baseline.